[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"job-sacvin-nigeria-ltd-production-planning-execution-coordinator-utRkNx":3},{"id":4,"title":5,"departement":6,"description":7,"createdAt":8,"updatedAt":9,"publishedAt":10,"closedAt":11,"company":12,"domains":27,"status":31,"slug":32,"uniqueCode":33,"ogImage":34,"questionnaire":6,"displayScoreForJobseeker":35,"workModel":6,"jobTypes":36,"experiencesLevels":38,"hardFilters":40,"minSalary":44,"maxSalary":45,"address":46,"currency":48,"isExternal":35,"externalLink":49,"externalPlatform":50},"6a45d9b184b058e4972b4b21","Production Planning & Execution Coordinator",null,"\u003Cb>Responsibilities:\u003C/b> \u003Cb>ERP Plan Monitoring &amp; Follow-Up:\u003C/b> \u003Cul>\u003Cli>Monitor the production plan in the ERP system daily for all Phase 2 machines (injection and blow moulding); compare planned output against actual production reported by shift supervisors and flag any variance to the Production Planner &amp; Executor immediately.\u003C/li>\u003Cli>Follow up with Phase 2 Injection and Blow Moulding production supervisors at regular intervals during the shift to obtain actual production counts per machine and per SKU; record and update tracking sheets in real time.\u003C/li>\u003Cli> Identify machines or SKUs running behind plan and escalate to the production planner &amp; executor with a clear summary of the shortfall, likely cause, and estimated recovery time.\u003C/li>\u003Cli>Update the ERP production plan under the direction of the production planner &amp; executor when schedule changes, delays, or order priority shifts are confirmed — ensuring plan accuracy is maintained at all times.\u003C/li>\u003C/ul> \u003Cbr /> \u003Cb>Mould Change Coordination:\u003C/b> \u003Cul>\u003Cli>Before any mould change is initiated on a Phase 2 machine, confirm with the relevant production supervisor that the current production run has been completed as planned or obtain revised quantity and explanation if not.\u003C/li>\u003Cli>Communicate the confirmed mould change schedule to the production supervisor and maintenance engineer (expat/local) in advance; ensure the next job card, material, and colour are ready before the change begins.\u003C/li>\u003Cli>If a current run is not complete and a mould change is due, escalate to the Production Planner Executor for a decision — never independently authorise a plan deviation.\u003C/li>\u003Cli>Record all mould changes in the ERP and tracking log including: machine number, outgoing SKU, quantity produced, incoming SKU, change start time, and change completion time.\u003C/li>\u003C/ul> \u003Cb>\u003Cbr />\u003C/b> \u003Cb>Supervisor Liaison &amp; Floor Communication:\u003C/b> \u003Cul>\u003Cli>Serve as the daily communication link between the production planner &amp; executor and the Phase 2 Injection and Blow Moulding production supervisors — translating plan requirements into clear floor instructions and feeding floor reality back to the planner.\u003C/li>\u003Cli> Attend the daily shift start briefing for Phase 2 and communicate the day's production priorities, any plan changes, and special instructions from the Production Planner &amp; Executor to the supervisors.\u003C/li>\u003Cli>Maintain a running log of all communications, plan changes, and supervisor confirmations throughout the shift for accountability and traceability.\u003C/li>\u003C/ul> \u003Cb>\u003Cbr />\u003C/b> \u003Cb>Reporting:\u003C/b> \u003Cul>\u003Cli>Prepare and submit a daily Phase 2 production tracking report to the Production Planner &amp; Executor covering: plan vs actual per machine, mould changes completed, pending completions, variances, and open issues.\u003C/li>\u003Cli> Maintain an accurate and up-to-date SKU-level production log for Phase 2 machines that can be referenced by the Production Planner &amp; Executor at any time during the shift.\u003C/li>\u003C/ul> \u003Cb>\u003Cbr />\u003C/b> \u003Cb>Requirements:\u003C/b> \u003Cul>\u003Cli>HND minimum in mechanical, industrial, production, or any engineering/science discipline.\u003C/li>\u003Cli>3–5 years experience in a production planning support, coordination, or shop floor tracking role in a manufacturing environment.\u003C/li>\u003Cli>Strong computer literacy — non-negotiable: must be proficient in ERP systems, Microsoft Excel (intermediate level minimum including formulas, filters, and pivot tables), Outlook, and Microsoft Teams.\u003C/li>\u003Cli>Ability to read and interpret production plans, job cards, and SKU schedules across multiple machines simultaneously.\\\u003C/li>\u003Cli>Strong attention to detail — must be able to identify plan vs actual discrepancies quickly and report accurately.\u003C/li>\u003Cli>Good communication and follow-up discipline — proactive, consistent, and does not wait to be chased for updates.\u003C/li>\u003Cli>Ability to work calmly under production pressure and manage multiple follow-ups simultaneously across Phase 2 machines.\u003C/li>\u003Cli>Basic understanding of injection moulding and blow moulding production processes — sufficient to have an informed conversation with supervisors and maintenance engineers.\u003C/li>\u003Cli> Strong written and spoken English for reports, ERP entries, and communication with the Production Planner &amp; Executor.\u003C/li>\u003C/ul> \u003Cbr /> \u003Cb>Working Relationships:\u003C/b> \u003Cul>\u003Cli>This role reports exclusively to the Production Planner &amp; Executor and has no independent decision- making authority on production plan changes, mould change approvals, or schedule revisions.\u003C/li>\u003Cli> All decisions are escalated to and confirmed by the Production Planner &amp; Executor.\u003C/li>\u003Cli> The coordinator works in daily contact with Phase 2 Injection and Blow Moulding production supervisors for floor data and communicates with maintenance engineers as needed for mould change timing. \u003C/li>\u003Cli>No direct external communication with sales, procurement, or customers — all such matters go through the Production Planner &amp; Executor.\u003C/li>\u003C/ul> \u003Cp>\u003Cbr />\u003C/p> \u003Cp>\u003Cb>Location: \u003C/b>SACVIN Nigeria Ltd – Mowe Plant (Phase 2)\u003C/p> \u003Cp>\u003Cb>Remuneration: NGN\u003C/b> 300,000 – 500,000 Monthly\u003C/p>","2026-07-02T03:23:29.916000Z","2026-07-12T09:22:08.878000Z","2026-07-02T03:23:30.550000Z","2026-09-28T03:23:30.550000Z",{"id":13,"name":14,"bio":15,"website":16,"email":6,"logoUrl":6,"webAccess":6,"country":17,"isDeleted":18,"isVerified":6,"createdAt":19,"credits":20,"phoneNumber":21,"billingType":22,"offerCount":23,"planUsage":24,"createdBy":6},"6a45d983126bd941e1831882","Sacvin Nigeria Ltd","Sacvin Nigeria Ltd is a manufacturer of plastic consumer products, offering a wide range of home, kitchen, storage, and children's items designed for durability and everyday use.","https://www.sacvin.com","NG",false,"2026-07-02T03:22:43.825000Z",0,"00312 11.765","credits",5,{"name":25,"limits":26,"limitsResetAt":6},"free",{"activeOffers":20,"talentPool":20,"storageMb":20,"candidateDetailsPerMonth":20,"matchesPerMonth":20,"assessmentsPerMonth":20,"cvDownloadLimit":20},[28],{"domainName":29,"strength":30},"Manufacturing",80,"published","sacvin-nigeria-ltd-production-planning-execution-coordinator-utRkNx","utRkNx","https://d3271xlc036mcy.cloudfront.net/og/Production-Planning-&-Execution-Coordinator-utRkNx.png",true,[37],"full_time",[39],"intermediate",{"countries":41,"educationLevels":6,"schools":6,"languages":6,"jobseekerTypes":42},[17],[43],"talent",250000,400000,{"street":6,"country":47,"countryCode":17,"postalCode":6,"city":47,"administrativeArea":6,"subAdministrativeArea":6,"locality":6,"subLocality":6,"geo":6},"Nigeria","NGN","https://www.jobberman.com/listings/production-planning-execution-coordinator-9k5nx0","Jobberman"]